Village Hall Strategic Development Group update

Four neat holes! These have been dug at various locations close to the outer wall of the hall so that our structural engineer can inspect the type of ground in order to design the new foundations. The inspection took place on Tuesday 8th October and the engineer’s designs will form part of our imminent Building Control application.